In the beginning, the Jai Hind metro station was prepared to generally be elevated. Nonetheless, the AAI objected that the elevated extend up towards the airport could pose a menace to aircraft, so the route was more reworked and also the station was shifted underground, a hundred and fifty m with the Airport terminal constructing.Use these creden